B&G Projects, Alterations, Modifications or Shut Downs: This page is designed to provide you with room or area shut downs due to the above mentioned. The following is a master list of projects that the Buildings and Grounds department is working on.
Click on the link below for more information:
| 219 Seminary - Convert Heat Sys 5/19 - 11/21/08 | |
| Campus - Ctr St Lights, Bldg Signage 6/26 - T.B.A. | |
| Campus - Fire Protection Systems 7/11 - T.B.A. | |
| Dietsch - Rrm Handcap Door Operators T.B.A. | |
| Findley - Rrm Heater Cntrl - 6/2 - T.B.A. | |
| Kamm - N Elevation Wall 5/19 - T.B.A. | |
|
Kulas - Gal Pipe 6/23 - T.B.A. |
|
| Lang - 3 Flr Rrm Shwr Valve Rplc, 7/28 - T.B.A. | |
| Malicky Ctr Dr Operators 7/1 - T.B.A. | |
| Marting - Dr Operators 6/2 - T.B.A. | |
| Roof Repairs 5/12 - T.B.A. | |
| Sac - Refinish Floors 5/11/2009 - T.B.A. | |
| Student Union - Rplc 2nd Blr, Ballrm Ceil, Lobby Lts 5/19 - T.B.A. | |
| Townhouse - Upgrade Elect., Wlk Lts 5/12 - T.B.A. | |