Buildings and Grounds

Projects and Shutdowns

B&G Projects, Alterations, Modifications or Shut Downs: This page is designed to provide you with room or area shut downs due to the above mentioned. The following is a master list of projects that the Buildings and Grounds department is working on.

Click on the link below for more information:

219 Seminary - Convert Heat Sys  5/19 - 11/21/08
Campus - Ctr St Lights, Bldg Signage  6/26 - T.B.A.
Campus - Fire Protection Systems  7/11 - T.B.A.
Dietsch - Rrm Handcap Door Operators  T.B.A.
Findley - Rrm Heater Cntrl -  6/2 - T.B.A.
Kamm - N Elevation Wall  5/19 - T.B.A.

Kulas -  Gal Pipe  6/23 - T.B.A.

Lang - 3 Flr Rrm Shwr Valve Rplc,  7/28 - T.B.A.
Malicky Ctr  Dr Operators  7/1 - T.B.A.
Marting -  Dr Operators  6/2 - T.B.A.
Roof Repairs  5/12 - T.B.A.
Sac - Refinish Floors  5/11/2009 - T.B.A.
Student Union - Rplc 2nd Blr, Ballrm Ceil, Lobby Lts  5/19 - T.B.A.
Townhouse - Upgrade Elect., Wlk Lts  5/12 - T.B.A.