| 219 Seminary - Convert Heat Sys 5/19 - 8/15/08 |
|
| 33 Beech - Instl Honors Ofc 4/22 - 7/31/08 |
|
| 63 Beech - Reno N & S Wing 6/23 - 7/16/08 |
|
| 63 Beech - Window Replacement 5/13 - 5/28/08 |
|
| Administration - Ext Bench Rplc 6/2 - 8/5/08 |
|
| Bagley Hall - Rplc N Side Windows 6/2 - 6/13/08 |
|
| Campus - Ctr St Lights, Bldg Signage 6/26 - 7/17/08 |
|
| Campus - Fire Protection Systems 7/11 - 9/29/08 |
|
| Campus - Install Pavers - 5/5 - T.B.A. |
|
|
Chapel - S Elevation, Fountain Wrk 4/21 - 7/18/08 |
|
| Constitution - W side Landscape 6/2 - 6/30/08 |
|
| Dietsch -Bldg Floor Rplc 6/1 - 6/30/08 |
|
| Dietsch - Rrm Handcap Door Operators T.B.A. |
|
| E. Bridge St Apt - Rplc HVAC Units 5/19 - 5/30/08 |
|
| Findley - Rrm Heater Cntrl - 6/2 - 7/1/08 |
|
| Hamilton Apt. - Update/Refresh 4/7 - T.B.A. |
|
| Heritage - E Section Reno 5/5 - T.B.A. |
|
| Kamm - N Elevation Wall 5/19 - T.B.A. |
|
|
Kulas - Rplc Lks, Gal Pipe 6/23 - 7/18/08 |
|
| Lang - 3 Flr Rrm Shwr Valve Rplc, 3Fl Rrm Cabinets 7/28 - 8/20/08 |
|
| Lang - 4Flr Room Htr Cvrs 5/28 - 6/6/08 |
|
| Loomis (MACS) Ht Sys Wrk, N/S Floor 6/30 - 7/11 & T.B.A. |
|
| Lou Higgins Rec Ctr - E Elev Cln/Seal, Urspng AHU Pan 5/19, T.B.A. |
|
| Malicky Ctr - Rat Lab Floor, E Ent Stairs/Vest, Dr Op 6/2 - 7/1 & T.B.A. |
|
| Marting - 1 & 2 Fl Carpet Rplc, Dr Op 6/2 - 7/4 |
|
| Merner-Pfeiffer - Rplc Valve Htrs, Locks 62 - 7/30/08 |
|
| Observatory - H20 Proof Found T.B.A. |
|
| Roof Repairs 5/12 - 7/25/08 |
|
| Sac - Refinish Floors 12/18 - T.B.A. |
|
| Saylor - Lobby Reno 5/19 - T.B.A |
|
| Stadium - Bleacher Rpr, Seal, Track/Field Install, Vip Booth, 6/2 - T.B.A. |
|
| Student Union - Rplc 2nd Blr, Ballrm Ceil, Lobby Lts 5/19 - T.B.A. |
|
| Townhouse - Upgrade Elect., Wlk Lts 5/12 - 8/11/08 |
|
| Wheeler - Stairtread Rplc 5/12 - T.B.A. |
|
|
|
|