Union (Strosacker) - Rplc 2nd Blr, Ballrm Ceil, Lobby Lts

Project Description

Building - Student Union (Strosacker)
Project Name - Rplc 2nd Blr, Ballrm Ceil, Lobby Lts
Project Manager - Bill Kerbusch bkerbusc@bw.edu, Don Cather dcather@bw.edu, Ted Gurnick tgurnick@bw.edu, Mark Boyette mboyette@bw.edu, Ed Murray emurray@bw.edu
Office Phone - 826-2235, 826-8144, 826-8145, 826-8150, 826-8145

Duration - 5/19 through T.B.A.

Description - The 2nd building boiler will be replaced. The Ballroom ceiling will be replaced. Installation of the building's management system (part 2 of a 3 year project). The main lobby area will have brighter lighting installed. Please use caution if in the areas of installation during these projects.

 